News

06.12.2017

Daily
Artikel Nummer: 21261

Swift unloading from ship to train


Mukran port, Germany’s easternmost deep water port, has inaugurated a new, EUR 1.17 million rail track 66. The extended track is now 350 m long and runs from existing facilities right up to the berth 5a quayside. This provides other berths with a direct rail link.

 

follow site In addition, the quayside track ensures that ship-to-train discharging and train-to-ship loading procedures are faster and more flexible. The rail network has been modified so that trains can be unloaded without the need for marshalling work.

http://schaper-verlag.de/?CAMS=famly-guy-porn  

The port railway, Baltic Port Rail Mukran, takes charge of the trains and runs them to the quayside. (ben)

www.mukran-port.de

follow url  

 

 

Related news